Systemplate with 30mm insulation: KDV

  • Thermal insulation with no thermal bridges
  • Exact pipe guide
  • Fast assembly
  • Tube support
  • Reduced Floor-stand height
  • Lower screed needs
  • Better controllability
  • Vapor barrier

System descriptionBecause of the concealed PS film the laying system board has a high compressive and flexural strength as well as a cover within the meaning of ÖNORM M7560 and DIN 18560 Part 2 against screed and mixing water.

Installation: Extremely fast routing for example, 300 with underfloor heating and 1560 running meter in a production hall.

Installation time for it: 3,8 hours (4 man) pitch 50 mm